![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
![]()
Slotronic A (black system) by B & R; no graphical visualisation
State-of-the-art control system with high reliability at that time.
Control system is structured more dynamically to simplify installation and operation of the plant.
The visualisation is implemented in colour and graphically revised, which means a substantial progress in the operation of the plant.
Introduction of a quality management system, which allows complete reproducibility of production.
The alarm system of the control system is extended to prevent loss of production.
Beginning of the transition to a new control system. The further extension to PC-controlled systems is considered already then.
Change to Slotronic 2000 FB with bus system. This means a substantial advantage for the manufacturing of switch cabinets. The new control system also marks the beginning of decentralisation.
Experimental plant installed in the company for testing the new PC control system and a decentralised system.
The first plant with PC control under Windows NT 4.0 is put into operation. The graphical surface offers enormous advantages for the operators of the plant. The larger hardware resources (faster processors and in particular larger storage media) allow an even more flexible operation and a more comprehensive quality management system.
The visualisation is improved again and extended to a multilingual system => it is possible to switch freely between the customer’s national language and German for our engineers.
Decentralisation and bus system are developed further and tested. The first soft PLC system is tested in the company.
The transition from external PLC systems (B&R) to a soft-PLC from Beckhoff (TWINCAT System with Profibus Master) is implemented.
These soft PLC systems allow a higher system stability and a substantially increased performance.
The control system for planned major projects is tested in the company with regard to system stability and performance. This is already based on soft-PLC systems.
Distance measuring for the transporting equipment is changed from incremental measuring to absolute measuring by means of laser measurement systems. For this transition the control system of the transporters is already decentralised. => The transporters are equipped with intelligent mini PLC systems. This permits the movement of the transporters without related PC control, which results in a great advantage for installation as well as for the customer.
Further information see chapter transporter control system.
Distance measuring is changed from laser to barcode system. The decentralisation was also demanded by suppliers (e.g. rectifiers etc.) This permits an easy-to-maintain and modular assembly.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||